Electrical panel upgrades in Charlotte, NC
Old fuse box, a 100-amp panel, breakers that trip whenever the AC and dryer run together, or no room for an EV charger. We price it, pull the Mecklenburg County permit, coordinate with Duke Energy and meet the inspector.
- NC licensed electrician · Lic. #U-00000 (demo)
- Price agreed before work
- 4.9★ from 208 Google reviews

Signs it's time
- A fuse box, or a panel more than about 30 years old
- Breakers that trip under normal use
- You're adding an EV charger, heat pump, hot tub or addition
- Your insurer or home inspector flagged the panel
- Scorch marks, buzzing or a warm panel cover
- No spare spaces for new circuits
What moves the price
- Whether the meter base and service wires also need upgrading
- Where the panel is and how easy it is to reach
- Grounding and bonding that needs bringing up to code
- How many circuits need new breakers
What a panel upgrade costs in Charlotte
You get a fixed price after a free on-site look. No surprises on the day.
- Panel replacement, same amperage$1,800–$3,000
- 100A to 200A service upgrade$2,800–$5,500
- Subpanel for a garage or addition$900–$2,000
- Permit and inspectionIncluded
Demo figures for a design template. A real client's own prices go here.
From first call to finished.
- Free estimateWe look at the panel, meter and wiring and give you a fixed price.
- PermitWe file the electrical permit with Mecklenburg County.
- Upgrade dayUsually one working day. Duke Energy disconnects and reconnects when the service changes.
- InspectionWe meet the county inspector and hand you the paperwork.
Panel upgrades: your questions.
How much does a panel upgrade cost in Charlotte?
Most of our 200-amp upgrades land between $2,800 and $5,500 (demo figures). The big variables are the meter base, the service wires and the grounding. You get a fixed price after a free on-site look.
Do I need a permit for a panel upgrade?
Yes. A panel replacement or service upgrade needs an electrical permit and an inspection in Mecklenburg County. We file it and meet the inspector.
How long will I be without power?
Usually most of one working day. We plan the shutoff with you in advance.
Do I need 200 amps for an EV charger?
Not always. A load calculation tells us whether your current panel can carry a charger, sometimes with a load-management device instead of a full upgrade.
Other electrical services in Charlotte.
Serving Uptown, Dilworth, Myers Park, SouthPark, Plaza Midwood, NoDa, Ballantyne, University City, Matthews, Mint Hill, Huntersville, Cornelius, Pineville and Fort Mill, SC.
Not sure if it's urgent? Ask us.
Call and describe it. We'll tell you straight if it can wait.